mpep.io

6.27Requirement for Marked-up Copy of Drawing Corrections

In addition to Replacement Sheets containing the corrected drawing figure(s), applicant is required to submit a marked-up copy of each Replacement Sheet including annotations indicating the changes made to the previous version. The marked-up copy must be clearly labeled as “Annotated Sheet” and must be presented in the amendment or remarks section that explains the change(s) to the drawings. See 37 CFR 1.121(d)(1) . Failure to timely submit the corrected drawing and marked-up copy will result in the abandonment of the application.

Appears in